Pipes

  • Cured-in-Place Prevention

    Why we televise all pipe during the two-year post-construction bonding period.

     
  • Image

    End of the Line

    Replace asbestos-cement pipe without turning the jobsite into a hazardous-waste site.

     
  • Image

    Diy Miami

    In crews use static pipe-bursting to replace 7% of city's water mains.

     
  • Insituform Wins $10.3M CIPP Project In Connecticut

     
  • Campaign Touts Plastic Pipe

    In 2007, Cascade, Idaho, began to replace its entire crack-ridden concrete, steel, and cast iron drinking water system with high density polyethylene (HDPE) pipe. The leaky system was taking its toll on residents, who paid $2.50/1,000 gallons of water in 2007—up from 73 cents in 1993.

     
 
 
 
 

PW's Network

Twitter Facebook LinkedIn