Sliplining success: hit or myth

The new liner pipes are lowered into the pit one at a time and jacked forward. Photos: HOBAS Pipe USA

Live sliplining with CCFRPM pipes can rehabilitate the old line with a minimum of disruption.

This project was 570 feet into the installation and still running smoothly. Pushes of 1000 to 1500 feet are common.

Close X