Slide Show

New footings are built under the existing structure. After the new bridge is slid into place, it's connected to the substructure and secured. Photos: Oregon DOT

Slayden Construction's Larry Gescher presents an award to Jackson Murphy, one of the Elkton High School student pylon (inset) designers, thanking him for his involvement.

Close X