-
-
How an 11-phase construction sequence sped up design and regulatory approval.
-
A “floating” water transmission line is designed to survive up to 6.5 feet of earth displacement during an earthquake. Second of two articles.
-
Web exclusive: View an AutoCAD Civil slideshow of the 11 construction phases required to replace water mains near a floodwall for the Springfield Water and Sewer Commission.
-
What would you do if your 70-year-old water infrastructure crossed three of the nation's most active fault lines? In the first of two articles, we look at what a four-county water system is doing to ensure operations continue when the next earthquake hits.
-
-
-
Award-winning overflow-abatement project uses a new type of plastic pipe.
-
Minnesota cities sign a joint powers agreement to install an emerging rehabilitation technique.
-
$275,000 static pipe-bursting machine pays for itself in four years.