-
How these trenchless technologies work.
-
Utah cracks down on construction-related traffic delays with accelerated bridge construction and "bridge move" techniques
-
Residents get the say-so on whether or not to build the Detroit River International Crossing (also called the New International Trade Crossing).
-
A Web-based tool provides national design standards for cost-effective, sustainable structures.
-
-
Groundbreaking research enables a 1.74-mile bridge over a whale waterway to proceed.
-
-
Lower bids for trenchless construction by showing contractors how quickly and easily the work can be done.
-
-
One state DOT's first experience with construction manager/general contractor project delivery.