Other stories by James Mcray

  • Working in Tandem

    Multiconfiguration trench shoring protects workers while they install cured-in-place pipe.

  • Riding the rail

    A 60-inch-diameter, welded-steel pipe typically is not the type of utility buried 19 feet under the road median at the end of your driveway. It's the creation of the Point of the Mountain Aqueduct (POMA), a job that involves installation of 68,500 linear feet of a new drinking water pipeline that...