    The 1.5-mgd tertiary-treatment wastewater reclamation facility has operated within all permit standards since startup in January 2010, thanks in part to CitectSCADA process control. The master lift station's new Allan Bradley MicroLogix 1100 control device and ABB ACS550 variable frequency drive, a $25,000 investment that's lowered electricity consumption at the station by more than one-third, connect to the new facility. Photo: Woodard & Curran

  • Image

    http://www.pwmag.com/Images/tmp213%2Etmp_tcm111-1356773.jpg?width=300

    true

    Image

    300

    At $50,000, chloramination was less than 5% of the cost required to design and build a new filtration facility. Within five months, trihalomethanes (THM) and HAA5s (the haloacetic acid family) compliance was achieved. Complaints about taste and odor are down by 90%. Photo: Woodard & Curran

  • Image

    http://www.pwmag.com/Images/tmp214%2Etmp_tcm111-1356778.jpg?width=300

    true

    Image

    300

  • Image

    http://www.pwmag.com/Images/tmp215%2Etmp_tcm111-1356782.jpg?width=200

    true

    Image

    200

    Inverness, Fla., Mayor Bob Plaisted (left) and City Manager Frank DiGiovanni wanted to establish a partnership with a consultant that would act as an administrative team member and not just a contractor. Photo: Woodard & Curran

By Michael Cherniak

PARTNERSHIP DETAILS:

CHALLENGE: Simultaneous system upgrades to reclaim wastewater and avoid regulatory fines
OWNER: City of Inverness, Fla.
CONTRACT OPERATOR: Woodard & Curran Inc., Portland, Maine
WATER TREATMENT CAPACITY: 1.5 mgd
WASTEWATER TREATMENT CAPACITY: 1.5 mgd
TERMS: 5 years at $1.6 million/year; reviewed and amended annually to accommodate treatment chemicals pricing

One way to tackle complexity is to expand resources. That's what the City of Inverness, Fla., did when faced with having to start up a new wastewater reclamation facility, resolve a drinking water consent order, and re-tool the asset management strategy for 32 wastewater pumping stations within 18 months.

Inverness had engineering and design plans to upgrade its secondary treatment facility into an electronically controlled, tertiary-treatment facility that produces effluent acceptable for public reuse. While more states are urging utilities to reclaim rather than discharge treated effluent, Florida is somewhat unique in its mission to reuse as much treated wastewater as possible.

City Manager Frank DiGiovanni wanted to ensure service wouldn't be disrupted during construction and the system would operate as intended. He also wanted to add depth to his utilities team and expand their expertise. He brought in Woodard & Curran Inc., a national consulting and operations firm that, among other services, provides technical support to start up and operate advanced biological nutrient removal facilities. “Our plan was to utilize the latest treatment technologies to produce high-quality reusable water,” he says. “We wanted to establish a partnership that would provide us with a team of skilled professionals who routinely operate these types of facilities. It was important to us to find a firm that could engage quickly and mesh with our staff.”

Contract operators face significant challenges, not the least of which is instilling a new working culture with former community employees who join the firm to form the operations team. “Regarding a contract service provider as a hostile presence diminishes the arrangement's value for both parties,” DiGiovanni says. “We expect a service provider to make those individuals better operators, design a career path for them, and utilize their skills in new or different ways.”

Luckily, DiGiovanni meant what he said.

My project management team was expected to attend weekly city staff meetings, provide updates, offer recommendations, and proactively contribute to capital planning efforts as the new wastewater reclamation facility underwent construction.

City employees were encouraged to interview with Woodard & Curran for specific utility positions. Five employees made the transition, bringing with them valuable institutional knowledge. Three additional staff members were hired and a Woodard & Curran project manager rounded out the new team. No jobs were lost.