Image
Above: The EI Toro Water District wastewater treatment facility serves 50,000 customers in Southern California. Right: ETWD supervisor Ed Peterson, left, and crew member Ty Banagas lower the mainline camera into a manhole for an inspection. Photos: Pearpoint Inc.